PR Gates / CI image pin matches docker/ci (pull_request) Successful in 22s
PR Gates / Docs update reminder (pull_request) Successful in 26s
PR Gates / decisions lifecycle (pull_request) Successful in 41s
Build ErsatzTV Image / Formatting (changed .cs conform to .editorconfig) (pull_request) Successful in 56s
review-verdict/h10 Review-verdict: MERGEABLE @ b91939e (base: main)
Build ErsatzTV Image / API docs in sync (OpenAPI + endpoint index) (pull_request) Successful in 59s
PR Gates / Script tests (pytest) (pull_request) Successful in 1m56s
Build ErsatzTV Image / Functional E2E (curl + UI contracts) (pull_request) Successful in 18m6s
Build ErsatzTV Image / EF migration integrity (SQLite + MySql) (pull_request) Successful in 20m3s
Review verdict / Set review-verdict status (pull_request_target) Successful in 5s
Build ErsatzTV Image / Build & test (.NET) (pull_request) Successful in 9m4s
Build ErsatzTV Image / Build & push image (amd64) (pull_request) Has been skipped
Round 1 BLOCKED (1 Blocker, 4 High, 3 Medium, 2 Low); round 2 BLOCKED on the fix (1 Blocker, 2 High, 4 Medium, 2 Low); round 3 BLOCKED on one Medium. Every finding re-verified against the live instance before acting. ROUND 2 — the blocker was self-inflicted and the local gate could not see it. Adding `branches: [main]` to ci-image.yml re-points `ci-image-pin`'s `expected` at the editing commit, staling all five `container:` pins and failing that BLOCKING job — for a change altering zero bytes of the toolchain image. Reproduced: expected=ed9dd6254 vs pins=32747a0. Reverted here (the commit was amended, so no commit on the branch touches that path) and filed as #744. That edit had also FALSIFIED its own justification: branch publishing IS load-bearing — docs/ci-cd.md documents the rebase-recovery flow as "let ci-image.yml publish :<short sha>, then bump the pin", which is how you satisfy ci-image-pin from inside a PR. Reverting also keeps three trigger descriptions true (ci-cd.md:1043, the recovery flow, pr-checks.yml's escape-hatch comment). Also fixed: - gate-trigger-base-resolved.md was the file round 1's fix did not touch, and still said "no workflow route retains human provenance" — false, since a PR-added workflow can reference RENOVATE_TOKEN. Its `rule:` also kept the race framing, and `rule:` is what the catalog and MemPalace mirror. - `mechanics:` claimed "independent review confirmed no CI consumption breaks". It confirmed no such thing. Round 3 then caught the REPLACEMENT sentence making the same class of error: only the `container:` pull is exercised by a PR, because `build` carries `if: github.event_name != 'pull_request'` and cache-to/cache-from live only there. Those and the base-image pull first run on the post-merge push to main — a wrong inference reddens main, not the PR. - A fourth surviving route was unnamed: docker-build.yml publishes :prod from a `v*` tag push and a tag may point at any commit (tag protections are empty). "three surviving routes" became "at least these" — a count reads as complete. - Unmarked inferences, a "three later sections" that undercounted four, a dangling "the two items below", and a #744 rationale that stated the pin toll without its documented remedy. Local gate: 432 script tests pass; `decisions_validate.py --base origin/main --head HEAD` and `build_decisions_catalog.py --check` both exit 0; ci-image-pin recomputed by hand and matching the pinned commit. The record is 62 prose lines against a 60-line ceiling that is a `::warning::` by design (#520) — the blocking constraint is the 2-25% minority band, currently 10.8%. Refs #697, #742, #743, #744. Decisions-Edit: yes Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>