Commit Graph
12 Commits
Author SHA1 Message Date
timothy 9ea2750cbf feat(392): expose ProgramSchedule.padToNearestMinute on the REST API 2026-07-23 08:03:31 +02:00
timothyandClaude Opus 4.8 8090e10408 fix(api): #265 — If-Match evaluates per RFC 7232 (valid-but-non-matching → 412, not 400)
The shared optimistic-concurrency parser (ConcurrencyHeaders.ParseIfMatch) classified any
non-canonical/weak/list If-Match value as Malformed → 400. Per RFC 7232 §3.1 a syntactically
-valid entity-tag that simply doesn't strong-match must be 412; 400 is only for a genuine
grammar violation.

- Rewrite ParseIfMatch as a real RFC 7232 entity-tag/list parser: walks the comma-separated
  1#entity-tag list, validates each [W/]DQUOTE *etagc DQUOTE member, and collects the strong
  members whose opaque text is our canonical decimal. Weak / empty / non-canonical /
  out-of-range tags are valid but contribute no version (→ empty set → 412); genuine grammar
  violations (unquoted, SP-in-tag, unterminated, garbage) → 400.
- Reshape IfMatchCondition.ExpectedVersion : Option<int> → ExpectedVersions : Option<Seq<int>>
  and VersionedAggregateExtensions.CheckVersion → set membership (any strong match proceeds;
  empty set always 412). Threads through 10 replace/update commands + handlers + request
  mappers + 9 controllers.
- No wire-contract change (400 + 412 already declared on every PUT; the field is header-derived
  and internal — no DTO/route/response-type/OpenAPI change).
- Tests: ConcurrencyHeadersTests rewritten for the new classification (lists, weak, empty,
  non-canonical → Version/empty-set; grammar violations → Malformed) + new
  VersionedAggregateExtensionsTests for CheckVersion membership/empty-set/force-write.
- Docs: api-conventions.md §7a rewritten; decisions.md entry appended.

Refs #253 #197
fixes #265

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-12 23:09:36 +02:00
timothyandClaude Opus 4.8 9e48aaefea test(#259): cover id-mode subtype-change (delete+insert) with a same-type sibling
Build ErsatzTV Image / Docs update reminder (pull_request) Successful in 7s
Build ErsatzTV Image / EF migration integrity (SQLite + MySql) (pull_request) Successful in 6m52s
Build ErsatzTV Image / Build & test (.NET) (pull_request) Successful in 7m2s
Build ErsatzTV Image / Build & push image (amd64) (pull_request) Has been skipped
Review-caught coverage gap: the existing Subtype_Change test runs the POSITIONAL
path (id-less payload). Add a handler-level test for the id-mode branch — one
id-matched item changes subtype (One->Duration: delete+insert, new id) while a
sibling id-matched item keeps its subtype (Multiple: in place, id + fill-group
state preserved) in the same payload. Proves the delete pass + match-pass Remove/Add
don't double-handle and the survivor's state is retained.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-11 22:03:33 +02:00
timothyandClaude Opus 4.8 162b334e5d test(#259): id-based reconcile matrix + docs (api-conventions §7c, decisions)
Add the id-based reconcile tests to ReplaceProgramScheduleItemsReconcileTests:
reorder moves state with the logical item (the non-vacuous core — proven to fail
under forced-positional), insert-in-middle, delete-unreferenced, unknown-id→422,
duplicate-id→422, and stale-version+unknown-id→412 (412 precedes 422, §7c). The
GET→map→PUT lossless round-trip now round-trips r.Id so it exercises id-mode.
Threads the new int? Id through all command/wire construction sites in tests.

Docs: api-conventions §7c (stable child identity + the deliberate #2-#5 positional
asymmetry) and a decisions.md entry.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-11 21:53:50 +02:00
timothyandClaude Opus 4.8 02a493e95e feat(#259): id-based reconcile for schedule-items replace (backend + DTO)
Add optional `int? Id` to ScheduleItemRequest/ReplaceProgramScheduleItem so
a client can round-trip each existing item's server id. When ids are present,
ReplaceProgramScheduleItemsHandler reconciles by id (not array position), so an
item's persisted fill-group/shuffle state (PlayoutScheduleItemFillGroupIndex,
FK OnDelete Cascade) follows the logical item across reorders/inserts instead of
being inherited by whatever previously occupied its new slot (#259, split from
#252/#253). A fully id-less payload keeps the verbatim positional fallback.

Guards (inside PersistItems, after CheckVersion so 412 precedes 422): duplicate
id -> 422; id not in this schedule -> 422 (a stale id under Phase-1 force-write is
a live lost-update signal, not a new item). Index stays array-position derived.

Regenerated v1.json + TS client.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-11 21:43:52 +02:00
timothyandClaude Opus 4.8 5c9f04fdec feat(#253 PR2): optimistic-concurrency on schedule-items aggregate
Wire the frozen #253 ETag/If-Match/412 recipe onto ProgramSchedule /
schedule-items, keeping the PR#258 positional in-place reconcile intact.

Backend:
- ReplaceProgramScheduleItems command gains Option<int> ExpectedVersion;
  ReplaceScheduleItemsRequest.ToCommand threads it.
- Handler: standalone CheckVersion Either AFTER validation (so 412 isn't
  flattened to 422), unconditional Version++ before save, guarded save via
  SaveChangesWithConcurrencyGuard, and 412 propagated without running the
  post-save reload/enqueue.
- ProgramScheduleViewModel + Mapper carry Version.
- ScheduleController: GET /items emits ETag; PUT /items parses If-Match
  (malformed -> 400), threads ExpectedVersion, re-queries for the new ETag,
  and advertises 400/412.
- Sibling config-writers (Add/Delete item, Update schedule) bump Version.

Frontend:
- schedules.ts: getScheduleItemsWithMeta + replaceScheduleItems(ifMatch)
  returning ResponseWithMeta.
- SchedulesScreen: etagRef threaded through the #242 dirty-guard (set from
  load + every successful save); 412 opens a conflict ConfirmDialog whose
  Reload discards the draft and re-runs loadItems.

Tests: handler concurrency suite (stale->412 no mutation + fill-group state
untouched, match/absent success+bump, no-op still bumps, racing save->412);
controller ETag/If-Match/412 cases; SchedulesScreen 412-conflict-dialog test.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-11 18:36:25 +02:00
timothyandClaude Opus 4.8 64473b136d fix(scheduling): stop silently resetting fill-group state + invalidate deco edits (#251, #252)
Build ErsatzTV Image / Docs update reminder (pull_request) Successful in 5s
Build ErsatzTV Image / Build & test (.NET) (pull_request) Successful in 7m56s
Build ErsatzTV Image / EF migration integrity (SQLite + MySql) (pull_request) Successful in 10m22s
Build ErsatzTV Image / Build & push image (amd64) (pull_request) Has been skipped
#252: ReplaceProgramScheduleItems deleted and re-inserted every item on every
save (even a no-op PUT-back), and PlayoutScheduleItemFillGroupIndex.ProgramScheduleItemId
is OnDelete(Cascade) — so every schedule save silently wiped persisted
fill-group/shuffle enumerator progression for all playouts using the schedule.
Switch to a positional in-place reconcile: for a same-typed slot, copy scalars via
CurrentValues.SetValues (BuildItem stays the single source of item construction, so
no field is dropped) and rebuild the watermark/graphics join rows, keeping the item
id — and with it the fill-group index. Subtype change / surplus falls back to
delete+insert for that slot only. The request DTO carries no stable item id, so
position is the only key here; true content-aware stable identity is deferred to the
shared concurrency/round-trip contract in #253.

#251: deco / deco-template CONTENT edits (and default-deco assignment) only take
effect on a playout Reset build — deco/break/default-filler content is applied during
Reset, a Continue keeps the frozen filler items, and BlockKey change-detection has no
deco dimension to self-heal. The editors enqueued nothing (a commented-out TODO in
ReplaceDecoTemplateItemsHandler), so filler/break content stayed stale indefinitely
until a manual Reset. Enqueue BuildPlayout(Reset) for exactly the affected playouts:
- ReplaceDecoTemplateItemsHandler: playouts via PlayoutTemplate.DecoTemplateId
- UpdateDecoHandler: playouts via Playout.DecoId and via deco-template items
- UpdateDefaultDecoHandler: the reassigned playout (adjacent same-class fix)
Post-commit enqueues use CancellationToken.None (audit #22 policy).

Tests: DecoInvalidationTests + ReplaceProgramScheduleItemsReconcileTests, each proven
non-vacuous against a negative control (inverted the primitive, verified 0 CS errors so
the --no-build run used a fresh dll). Full ErsatzTV.Tests suite green (1067).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-11 15:08:58 +02:00
timothyandClaude Fable 5 794bb0d4bb fix(schedules): reload write-path response with read includes + order GET by index (#229)
Bug 1 (500 on watermark/graphics save): Replace/Add handlers projected the
freshly-built entity graph, whose ProgramScheduleItemWatermark / -GraphicsElement
join rows carry only foreign-key ids — the Watermark/GraphicsElement navs are null,
and Mapper.ProjectToViewModel dereferences them unguarded, throwing an NRE that the
controller surfaced as a 500 on PUT/POST. Both handlers now reload the persisted
item(s) through the read-side include chain before projecting. Extracted that chain
into ProgramScheduleItemQueryExtensions.IncludeScheduleItemDetails() so GET, Replace
and Add share one source of truth.

Masking: PersistItems returned a lazy LanguageExt Map, and the existing round-trip
test only checked .IsRight — never enumerating it, so the deferred NRE never fired.
The new ScheduleItemWriteProjectionTests force enumeration (as the controller's
.ToList()/serialization does) and seed watermark/graphics via a separate context so
the handler's fresh factory context has nothing pre-tracked.

Bug 2 (server side): GetProgramScheduleItemsHandler now .OrderBy(i => i.Index) —
it previously returned id order, which is not index order.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-11 01:26:25 +02:00
timothyandClaude Fable 5 5918e947d9 test(schedules): pin FixedStartTimeBehavior + FixDiscardToFillAttempts in round-trip (F7)
Build ErsatzTV Image / EF migration integrity (SQLite + MySql) (pull_request) Failing after 2s
Build ErsatzTV Image / Docs update reminder (pull_request) Successful in 12s
Build ErsatzTV Image / Build & test (.NET) (pull_request) Successful in 9m1s
Build ErsatzTV Image / Build & push image (amd64) (pull_request) Has been skipped
Seed a non-null FixedStartTimeBehavior (Flexible) on the Fixed-start item and
assert it survives envelope A; assert the Marathon-order Duration item's
DiscardToFillAttempts is zeroed by the deliberate FixDiscardToFillAttempts
server normalization (Random/Shuffle keep the value, all else -> 0).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-11 01:00:34 +02:00
timothyandClaude Fable 5 b13fb0ffc7 test(api): lossless GET->PUT round-trip + EnforceProperties normalization (#126 #207 #212)
Fixed-point round-trip over all schedule-item subtypes (One/Flood/Multiple/
Duration) and field families (fixed-start, preferred audio/subtitle, custom
title, marathon, fillers x5, 2 watermarks, 2 graphics, rerun, search) proving
the flat ScheduleItemResponseModel reconstructs an identical PUT. Second test
documents the deliberate ShuffleScheduleItems normalization (Flood->One,
Fixed->Dynamic, Playlist->PlaybackOrder None).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-10 23:50:10 +02:00
timothy 4b4e2b2f82 feat(api): add schedule item duration estimates
refs #111
2026-07-03 23:41:57 +02:00
timothy b552905799 feat(api): add schedule REST endpoints
Build ErsatzTV Image / Build & test (.NET) (pull_request) Successful in 3m40s
Build ErsatzTV Image / EF migration integrity (SQLite + MySql) (pull_request) Successful in 4m52s
Build ErsatzTV Image / Build & push image (amd64) (pull_request) Has been skipped
Refs #36
2026-06-29 08:13:14 +02:00